Lichfield Cruising Club has now been granted planning permission for the construction of a new mooring basin and dry dock facility to replace the moorings and slipway being lost due to the imminent construction of the HS2 railway line.
The line of the new HS2 passes directly through the existing Cappers Lane bridge which was rebuilt in 2006 as part of the restoration of the Lichfield (ex Wyrley & Essington) Canal. It also obliterates the existing slipway and, along with the consequent realignment of Cappers Lane, causes the loss of 12 of the Club's moorings and the associated car park. The new development, funded by HS2, will provide replacement for these facilities on a like-for-like basis. It is hoped that construction will start soon so that the moorings can be relocated before work starts on the construction of the rail line.
